GENERIONCONNECTING SOLUTIONS
Air PurificationProductsTechnologyEnergy EfficiencyFood Safety & QualityTest ReportsCertificates
STERIONIZER / BUILDING PERFORMANCE

Better air.
Lower energy demand.

Energy efficiency starts with intelligent air management.

Combine active air treatment with continuous indoor air quality monitoring and responsive HVAC control to reduce unnecessary ventilation loads.

Explore the approach ↓View STERIONIZER products
Bright planted office interior with gentle green airflow illustrating clean indoor air and intelligent HVAC management
INDOOR AIR QUALITY + HVAC EFFICIENCY

A connected approach
to building performance.

20–40%

Potential HVAC electricity savings

Indicative range for integrated air treatment and HVAC management.

15–30%

Potential cooling-load reduction

Potential reduction in cooling demand under suitable operating conditions.

60%

Less outdoor air in the cited pilot

Fresh-air intake reduction reported at Israel Electric Corporation headquarters.

Presentation figures, not guaranteed project outcomes. The 60% figure concerns outdoor-air intake, not electricity consumption. Results depend on the building, climate, occupancy and system design.

THE ENERGY CHALLENGE

Outdoor air carries
a conditioning load.

Ventilation supports indoor air quality. Bringing outdoor air into a building also creates heating, cooling and humidity-control demands, as well as fan energy use.

The integrated approach treats indoor air, monitors the conditions that matter, and adapts ventilation to the building’s needs.

01

Heating & cooling

Conditioning incoming air to the required indoor temperature.

02

Humidity control

Managing moisture as part of indoor comfort and system operation.

03

Air movement

Fan operation and ventilation flow contribute to total HVAC demand.

MONITORING + TREATMENT + CONTROL

One coordinated approach
to air quality and energy.

01 / MONITOR

Measure indoor conditions

Track CO₂, particles, VOCs, temperature, humidity and occupancy where suitable sensors are available.

02 / TREAT

Integrate STERIONIZER

Install the appropriate air-treatment module in the HVAC system, following the product’s installation guidance.

03 / CONTROL

Respond to demand

Use building controls to coordinate outdoor-air dampers, fans and treatment operation against the agreed operating criteria.

04 / VERIFY

Check performance

Review monitored air quality and metered energy data, then refine system settings against the baseline.

Ventilation changes require a building-specific engineering assessment and compliance with applicable requirements. Air treatment does not replace required ventilation or CO₂ control.
STERIONIZER bipolar ionization technology and productSTERIONIZER / HVAC INTEGRATION
BUILT INTO THE AIR SYSTEM

Air treatment within
the HVAC strategy.

STERIONIZER integrates into an approach that combines sensors and building management controls to evaluate air treatment, ventilation and energy use together.

Start with the building’s HVAC configuration, establish baseline air quality and energy use, then define a monitored pilot and assessment criteria.

CASE STUDY / HAIFA, ISRAEL

Israel Electric Corporation
Headquarters pilot.

60%reduction in outdoor-air intake
reported in the presentation

GENERION’s presentation describes a monitored pilot in an occupied office building at 1 Netiv HaOr Street, Haifa, using STERIONIZER D6 modules within the central HVAC system.

FIELD MONITORING

July–October 2024

The presentation identifies ESC as the independent environmental laboratory and describes air-quality measurements during normal building operation.

ENGINEERING ESTIMATE

450,000 kWh / year

Projected annual energy reduction for the headquarters building, as stated in the engineering opinion attributed to Rafi Aharoni. This is an estimate, not metered annual savings.

PROJECTED COST SAVING

₪225,000 / year

The presentation’s corresponding annual cost estimate for that building, based on the assumptions used in the cited engineering assessment.

Source: GENERION energy-efficiency presentation, slides 50 and 52. Pilot measurements and engineering projections are presented separately. Full supporting documentation is needed for project-level verification.

FROM BUILDING DATA TO A PROJECT SCOPE

Assess your building’s
energy-saving potential.

Establish the baseline

Review HVAC drawings, ventilation rates, occupancy, energy bills and available IAQ monitoring.

Define a monitored pilot

Agree on the installation scope, controls strategy, measurement period and performance criteria.

Evaluate the result

Compare air-quality trends and energy measurements with the baseline before extending the approach.

Discuss a building assessment

Source: GENERION energy-efficiency presentation, slides 18–22, 50, 52 and 55. Achievable savings require site-specific assessment and performance verification.